Laydown frame
A perfect tool to ensure safe core samples extraction from the core string on surface. The frame allows to lay down the core samples horizontally without damage, for example directly from the rig floor onto the catwalk. The frame can also be coupled directly to the Core Saw for the core samples to be cut into transportable pieces with protective tube using the saw.
Function description
The “Lay Down Frame” transport equipment moves the inner pipe with the drill core from the vertical position to the horizontal position. The inner pipe is supported by the transport equipment during the change of position so that as little bending stress as possible is transferred to the drill core.
Please contact us for more information.
Specifications

Downloads
Here you can download the workshop equipment catalogue.
Related products
2-split Offshore Wireline Unit
3-split Offshore Wireline Unit
Core Saw
Mobile heavy duty Double Workover Rig 90 tons
- SISU heavy duty truck with Caterpillar engine, 10x10 drive for extreme off-road capabilities
- road approval (Germany, Romania) dimensions and weight within the permitted legal limits for special trucks
- 6 hydraulical supports, mechanically locked
- 90 tons hook load
- drawworks with closed-loop cooling and API 7K monogram
- sand-line drum for 3000 m working depth (higher depths possible)
- powerful hydraulic by truck engine via Allison transmission 4700 OFS
- mast with automatic lock in end position (retracted and extended) and API 4F monogram
- electric safety according to EN 60204
- automatically uplifting working platform while mast telescoping
- stairs foldable for transport
- store capacity for 140 double tubings up to 31/2“
- turning circle under < 20 m
- working temperature range -29°C / +45°C (+55°C for special operations)


















