Microtrenching ist ein zerstörungsarmes und sehr schnelles Verfahren zur Verlegung von Kommunikationskabeln in bestehenden Verkehrsflächen. Dabei werden mit Diamantscheiben breite Fugen in die Oberflächen geschnitten. Unmittelbar nach dem Schnitt werden Leerrohre eingelegt und anschließend die Fuge vergossen. Zeit- und kostenintensive Erdarbeiten am Rande der Verkehrsflächen werden so vermieden bzw. minimiert.
2-split Offshore Wireline Unit
The KOLLER 2-Split Offshore Wireline Unit has been designed for measurements, slickline and e-line activities with wire capacities above 7,650 m / 25,000 ft. It is suitable for both offshore and onshore applications. The 131 HP guarantees maximum pull force and speed at any depth, even with heavy tools. One of the new features of the power pack is a maintenance free flame trap together with a fault analytic system. The optional available battery startup makes the system independent of any external power supply.
3-split Offshore Wireline Unit
The KOLLER 3-split Offshore Wireline Unit has been designed for measurements and workover activities with wire capacities above 7,650 m / 25,000 ft. The 3-skid layout is separated in a winch, an operators and a hydraulic power pack container. The hydraulic pump / motor combination guarantees high pull force and speed at any depth.
Lightweight Wireline Unit
The KOLLER Lightweight Wireline Unit has been designed for workover activities with wire capacities above 7,650 m / 25,000 ft. The 2-skid layout is separated in a winch / operators container and a hydraulic power pack. The hydraulic pump / motor combination guarantees high pull force and speed at any depth. The startup by spring starter makes the system independent of any external power supply.
Offshore Wireline Unit
The KOLLER Offshore Wireline Unit has been designed for measurements and workover activities with wire capacities above 7,650 m / 25,000 ft. It is suitable for both offshore and onshore applications. The 131 HP guarantees maximum pull force and speed at any depth, even with heavy tools. One of the new features of the power pack is a maintenance free flame trap together with a fault analytic system. The optional available battery startup makes the system independent of any external power supply.
Slickline Alu Unit
The KOLLER Slickline Alu Unit has been designed for workover activities with special weight restrictions.
The 2-skid layout is separated in a winch / operators module and a hydraulic power pack. The hydraulic pump / motor combination guarantees high pull force and speed at any depth. The unit starts with a spring-starter which makes the system independent of any external power supply.
The modular system is very flexible enabling a set up with or without cabin. Not using the cabin, more or larger wire can be spooled before the weight restrictions will be executed.